LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2023 >> Macan Base >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 3 (15 Engine - Cylinder Head, Valve Drive 2.9L -- 95B - MACAN (95B)) >> WM, 158219 Removing And Installing Cylinder Head Cover (V6 Turbo) >> Preliminary Work >> Preliminary Work - Right Cylinder Bank

Preliminary Work - Right Cylinder Bank

WARNING: This page is about a different variant/trim than selected.
  1. Remove timing chain.
    • 153519 Removing and installing timing chain (V6 Turbo) 
  2. Remove tank vent valve.
    • 202319 Removing and installing tank vent valve (V6 Turbo) 
  3. Remove fuel injectors.
    • 244019 Removing and installing fuel injector (V6 Turbo) 
  4. Remove the high-pressure pump.
    • 246319 Removing and installing high-pressure pump (V6 Turbo) 
  5. Remove hydraulic valve for valve lift switchover.
    • 155519 Removing and installing hydraulic valve for valve lift switchover (V6 Turbo) 
  6. Remove lower part of sound insulation.