LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2023 >> Macan Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 17 (21 Exhaust Gas Turbocharging 3.0L -- 95B - MACAN (95B)) >> WM, 213019 - Removing And Installing Turbocharger (V6 MONOTURBO) >> Installing Turbocharger

Installing Turbocharger

WARNING: This page is about a different car, the 2021 Porsche Macan, 2020 Porsche Macan, and 2019 Porsche Macan. However, it is still accessible from the selected car via links, so may be relevant.

Information 

  1. Replace oil return line -1-  .
    G15151391Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Oil return line

    1. 1.1  Remove pin -2-  and pull off old oil return line -1-  .
    2. 1.2  Insert new oil return line -1-  and secure with a new pin -2-  .
  2. Install turbocharger -1-  .
    G15151392Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Turbocharger

    1. 2.1  Fit new seals on the exhaust flange
    2. 2.2  Position turbocharger -1-  and exhaust pire -4-  in the clamps -5-  and make sure that the oil return line is fitted correctly.
    3. 2.3  Replace V-band clamp on exhaust pipe -3-  including seal and fit and tighten new V-band clamp on exhaust pipe -3-  .
      • 20 (15 ftlb.) 11 Nm 
    4. 2.4  Replace nuts on exhaust pipes -2-  .
    5. 2.5  Screw on and tighten new nuts on exhaust pipes -2-  .
      • Tightening torque 25 Nm (19 ftlb.) 
  3. Install active carbon filter line -1-  .
    G15151393Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Active carbon filter line

    1. 3.1  Replace O-ring.
    2. 3.2  Insert active carbon filter line -1-  .
    3. 3.3  Fit and tighten screw for active carbon filter line -2-  .
      • Tightening torque 9 Nm (6.5 ftlb.) 
  4. Secure turbocharger -1-  on primary catalytic converter -2-  or particle filter.
    G15151394Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Turbocharger on primary catalytic converter

    1. 4.1  Replace seal and V-band clamp -3-  .
    2. 4.2  Position catalytic converter and fit and tighten V-band Clamp -3-  .
      • Tightening torque 7 Nm (5 ftlb.) 
  5. Connect line connections and electric plug connection.
    G15151395Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Line connections for turbocharger

    1. 5.1  Secure coolant lines -1-  .
      1. 5.1.1  Replace O-rings.
      2. 5.1.2  Insert coolant lines -1-  .
      3. 5.1.3  Screw in and tighten screws for coolant lines -2-  .
        • Tightening torque 9 Nm (6.5 ftlb.) 
    2. 5.2  Secure oil supply line -3-  .
      1. 5.2.1  Replace O-ring.
      2. 5.2.2  Insert oil supply line -3-  .
      3. 5.2.3  Screw in and tighten screw for oil supply line -4-  .
        • Tightening torque 9 Nm (6.5 ftlb.) 
    3. 5.3  Connect vacuum line -5-  to vacuum unit.
    4. 5.4  Connect and lock electric plug connection for recirculating air valve -6-  .