LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2023 >> Macan Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 10 (15 Engine - Cylinder Head, Valve Drive 3.0L -- 95B - MACAN (95B)) >> WM, 154719 - Removing And Installing Guide And TENSIONING Rails (V6 Turbo) >> Installing Guide And TENSIONING Rails >> Installing Guide And Tensioning Rails - Left Cylinder Bank

Installing Guide And Tensioning Rails - Left Cylinder Bank

WARNING: This page is about a different car, the 2021 Porsche Macan, 2020 Porsche Macan, and 2019 Porsche Macan. However, it is still accessible from the selected car via links, so may be relevant.
  1. Install slide -1-  .
    1. 1.1  Push slide -1-  onto holder -2-  until the locking lug -3-  en gages in the cut-out -4-  .
      G15145649Courtesy of PORSCHE CARS NORTH AMERICA, INC.

      Slide

  2. Install guide and tensioning rails -1 and 2-  .
    1. 2.1  Install guide rail -1-  .
      1. 2.1.1  Position guide rail -1-  .
      2. 2.1.2  Fit and tighten screws -3-  .

        > Tightening - torque 9 Nm (6.5 ftlb.) 

    2. 2.2  Install tensioning rail -2-  .
      1. 2.2.1  Position tensioning rail -2-  .
      2. 2.2.2  Fit and tighten bearing pins -4-  .

        > Tightening - torque 23 Nm (17 ftlb.) 

        G15145650Courtesy of PORSCHE CARS NORTH AMERICA, INC.

        Guide and tensioning rails - left cylinder bank