LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2023 >> Cayenne Base, 4D Utility Coupe >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 33 (24 Fuel System - Electronic Injection 4.0L -- 9YA - Cayenne (9YA)) >> WM, 244019 Removing And Installing Injector Valve (Injector) >> Preliminary Work

Preliminary Work

WARNING: This page is about a different variant/trim than selected.

Information 

The removal procedure is shown on one side and is the same for the other side.

  1. Remove fuel collection pipe.

    V6 Turbo: 

    > Removing and installing fuel collection pipe (V6 Turbo) 

    V8 Turbo: 

    > Removing and installing fuel collection pipe (V8 Turbo) 

  2. Remove sound absorber -1- 
    G15258932Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Sound absorber (shown on V8 biturbo)

  3. Spray fuel injector seats in the cylinder head with Caramba EDI special solvent for injectors and leave it to take effect.