Preparing Connection Areas Of Body For Installing Outer Side Member
- Align the sealing surfaces and connections of the body.
- De-burr connection points and prepare them for joining.
- Prepare connection areas > Connection areas
for bonding, riveting and resistance spot-welding.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE
Connection areas
Yellow Bonding and resistance spot-welding
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVEOrange Bonding and riveting
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE - Prepare connection areas > Connection areas
for applying a full aluminium weld using inert gas.
Connection areas