Installing Cross Panel (Upper Section)
- Installation is performed in reverse order. Pay particular attention to the following:
Tighten screws securing cross panel (upper section) to bracket to > Tightening torque 10 Nm (7.4 ftlb.) >.
Tighten spring nuts securing heat shield to cross panel (upper section) to > Tightening torque 2.5 Nm (1.8 ftlb.) >
Tighten nuts securing external power connection to bracket to > Tightening torque 3 Nm (2.2 ftlb.) >.
Tighten nut securing power distributor at the front to external power connection to > Tightening torque 9 Nm (6.6 ftlb.) >.