Installing Lock Carrier
Installation is performed in reverse order. Pay particular attention to the following:
- Tighten fastening screws on the upper lock carrier to > Tightening torque 8 Nm (5.9 lb.)
according to the specified tightening sequence > Tightening sequence.
Tightening sequence
- Tighten fastening screws on lower lock carrier to > Tightening torque 23 Nm (17 lb.) .
- Tighten fastening screw securing refrigerant lines to condenser to > Tightening torque 9 (6.5 lb.) Nm .