Installing Lock Carrier
- Installation is performed in reverse order. Pay particular attention to the following:
Tighten fastening screws on upper lock carrier to > Tightening torque 8 Nm (5.9 lb.) .
Tighten bottom fastening screw on lower lock carrier to > Tightening torque 10 Nm (7.4 lb.) .
Tighten top fastening screw on lower lock carrier to > Tightening torque 25 Nm (18.4 lb.) .
Tighten fastening screw securing refrigerant lines to condenser to > Tightening torque 9 (6.5 lb.) Nm .