Installing Pressure Accumulator
Information
Check the following before installing the air line:
- Check that the cutting ring -1- and Voss threaded joint -2- are on the air line -3- (not relevant if the component was replaced and the Voss threaded joint that is pre-fitted on the component is used).
- Check that the air line is fitted correctly.
Check: Air line connection
Only one marking -1- on the air line should be visible.
Pull the air line briefly against the insertion direction. If it cannot be pulled out, the air line is fitted correctly.
Check: Air line fitted correctly
- Install pressure accumulator -1-
.
- 1.1 Insert pressure accumulator -1- in direction of -arrow- .
- 1.2 Fit nuts -6- .
- 1.3 Tighten nuts -5-
.
> Tightening torque 8 Nm (6 ftlb.)
- 1.4 Tighten nuts -6-
.
> Tightening torque 8 Nm (6 ftlb.)
- 1.5 Clip line -3- into clips -4- .
- 1.6 Fit and tighten line connection -2-
.
> Tightening torque 3.5 Nm (2.6 ftlb.)
Pressure accumulator
- Connect air line for compressor -1-
to pressure accumulator -2-
.
- 2.1 Push on air line for compressor -1- and secure spring band clamp -3- using > VAS 6890 - Spring Band Clamp Pliers .
- 2.2 Clip in clip -4- .
Air line for compressor