LEMON Manuals
: Even more car manuals for everyone
Home
>>
Porsche
>>
2022
>>
Panamera Base
>>
Repair and Diagnosis
>>
Engine Mechanical
>>
Blowers, Superchargers & Turbochargers
>>
21 Exhaust Gas Turbocharging 2.9L Turbo Gas -- 971 - PANAMERA (971)
>>
WM, 213919 Removing And Installing Pressure Hose (V6 BITURBO)
>>
Installing Pressure Hose
>>
Installing Moulded Hose
Installing Moulded Hose
Install moulded hose
-1-
from charge-air cooler to intake distributor.
1.1 Tighten screw-type
-Arrows-
clamps to >
Tightening torque 5.5 Nm (4 ftlb.) +/- 0.5 Nm (0.3 ftlb.)
.
Courtesy of PORSCHE CARS NORTH AMERICA, INC.
Moulded hose from turbocharger to intake distributor (right illustration)