Preparing Connection Areas Of Body For Installing Spring Strut Mount
- Align the sealing surface and connections of the body.
- De-burr connection points and prepare them for joining.
Information
- Before final assembly, make sure you fully understand all the work steps involved and carry out a trial assembly without applying adhesive.
- The bonding process can only be carried out reliably when a smooth and swift sequence of operations is guaranteed.
- Do not begin bonding work until all materials and tools necessary for later repair work are available.
- Prepare marked areas for bonding and riveting.
> 5X00IN WORKING WITH BODY STRUCTURAL ADHESIVE
Preparing body connection areas
Preparing body connection areas
- Prepare marked area -green- for applying a full weld using inert gas for the ground connection.
Preparing body connection areas