Preliminary Work - Right Cylinder Bank
WARNING: This page is about a different variant/trim than selected.
- Remove timing chain.
- 153519 Removing and installing timing chain (V6 Turbo)
- Remove tank vent valve.
- 202319 Removing and installing tank vent valve (V6 Turbo)
- Remove fuel injectors.
- 244019 Removing and installing fuel injector (V6 Turbo)
- Remove the high-pressure pump.
- 246319 Removing and installing high-pressure pump (V6 Turbo)
- Remove hydraulic valve for valve lift switchover.
- 155519 Removing and installing hydraulic valve for valve lift switchover (V6 Turbo)
- Remove lower part of sound insulation.