Installing Servo Motor For Front Right Temperature Mixing Flap
- Install servo motor for front right temperature mixing flap -1-
.
- 1.1 Position servo motor for front right temperature mixing flap -1- .
- 1.2 Screw in and tighten screws -3-
.
> Tightening torque 1.5 Nm (1 ftlb.)
- 1.3 Connect and lock electric plug connection -2- .
Servo motor for front right temperature mixing flap
- Install evaporator housing -1-
.
- 2.1 Fit evaporator housing -1- on the guide lugs -3- .
- 2.2 Screw in and tighten screws -2-
.
> Tightening torque 1.5 Nm (1.1 ftlb.)
Evaporator housing
- Secure electric line -2-
to the evaporator housing -1-
.
- 3.1 Clip electric line -2- into the holder -4- .
- 3.2 Connect and lock electric plug connection -3- .
Electric line at evaporator housing
- Secure electric line -2-
to the air intake tract -1-
.
- 4.1 Clip electric line -2- into the holders -4- .
- 4.2 Connect and lock electric plug connections -3- .
Electric line at air intake tract
- Check O-rings -3-
on the heat exchanger supply and return pipes -1 and 2-
for damage, replace them if necessary and check that the grommet -4-
is fitted correctly.
Heat exchanger supply and return pipes
- Install heat exchanger supply and return pipes -1 and 2-
.
- 6.1 Position heat exchanger supply and return pipes -1 and 2- .
- 6.2 Tighten V-band clamps -6-
.
> Tightening torque 1.8 Nm (1.3 ftlb.)
- 6.3 Clip in temperature sensor clip -5- .
- 6.4 Position holder -4-
and tighten screws -3-
.
> Tightening torque 1.5 Nm (1.1 ftlb.)
Heat exchanger supply and return pipes