Measurement 9
- Electric shock
- Short circuit
- Fire
- Explosion
→ Only appropriately trained and authorised persons are permitted to work on high-voltage vehicles and components.
→ Required qualification: High voltage technician or high voltage expert.
→ Observe national requirements and legislation for this work.
→ Always use insulated tools, e.g. > VAS 6883 - Insulated Tool Set when working on these components.
→ Observe general warning notes for working on the high-voltage system.
> 2X00IN GENERAL WARNING NOTES FOR WORKING ON THE HIGH-VOLTAGE SYSTEM
Preliminary work for measurement 9
(Check: High-voltage line from high-voltage distributor to voltage converter)
- Release, tighten and remove high-voltage line (from high-voltage distributor to voltage converter).
High-voltage line from high-voltage distributor to voltage converter
- Connect high-voltage test adapter > VAS 6558/9-6A - High-voltage test adapter
to high-voltage line (from high-voltage distributor to voltage converter). Leave the second connection open.
Measurement 9
- Perform measurement 9.
- 3.1 Setpoint value ≥ 1 GOhm
- Evaluate measured result
- 4.1 If the measured value is within the setpoint value range, continue with measurement 9.1 .
- 4.2 If the measured value is outside of the setpoint value range, replace high-voltage line (from high-voltage distributor to voltage converter).
After replacing the high-voltage line, repeat measurement 3.
Preliminary work for measurement 9.1
(Check: Air-conditioning compressor, high-voltage line from voltage converter to air-conditioning compressor)
- Remove bulkhead.
- Release and disconnect high-voltage line (from voltage converter to air-conditioning compressor) at the voltage converter.
High-voltage line from voltage converter to air-conditioning compressor
- Connect > VAS 6558A/30 - high-voltage test adapter
to high-voltage line (from voltage converter to air-conditioning compressor). Leave the second connection open.
Measurement 9.1
- Perform measurement 9.1.
- 8.1 Setpoint value ≥ 10 MOhm
The measurement must be repeated several times until a stable measured value is displayed.
- Evaluate measured result
- 9.1 If the measured value is within
the setpoint value range, replace the voltage converter.
After replacing the voltage converter, repeat measurement 3.
- 9.2 If the measured value is outside of the setpoint value range, continue with measurement 9.2 .
Preliminary work for measurement 9.2
(Check: High-voltage line from voltage converter to air-conditioning compressor)
- 9.1 If the measured value is within
the setpoint value range, replace the voltage converter.
- Release and disconnect high-voltage line (from voltage converter to air-conditioning compressor) at the air-conditioning compressor.
High-voltage line from voltage converter to air-conditioning compressor
- Connect > VAS 6558A/30 - high-voltage test adapter
to high-voltage line (from voltage converter to air-conditioning compressor). Leave the second connection open.
Measurement 9.2
- Perform measurement 9.2.
- 12.1 Setpoint value ≥ 1 GOhm
- Evaluate measured result
- 13.1 If the measured value is within
the setpoint value range, replace the air-conditioning compressor.
After replacing the air-conditioning compressor, repeat measurement 3.
- 13.2 If the measured value is outside of the setpoint value range, replace high-voltage line (from voltage converter to air-conditioning compressor).
- 13.1 If the measured value is within
the setpoint value range, replace the air-conditioning compressor.
After replacing the high-voltage line, repeat measurement 3.