Installing Tie-Rod Ball
CAUTION:
Electrically moved components
- Danger of limbs being trapped
→ Switch off electric power to drive motor.
→ Make sure it does not switch on again.
→ Check that there is no electric charge.
Information
Once PDCC is ready for operation, chassis adjustments can be made. To avoid injury/crushing, only work near the anti-roll bar, lower trailing arms and bellows of the steering gear without establishing operational readiness and always allow for the run-on time of 60 seconds.
Information
The procedure for removing and installing is described for one side as an example. The procedure for the other side is almost identical.
- Secure tie-rod ball -1-
to tie rod -2-
.
- 1.1 Screw on tie-rod ball -1- by the number of turns you wrote down.
- 1.2 Match position of tie-rod ball -1- with the marking.
- 1.3 Counter tie-rod ball -1- at the flattened areas -Arrows- using a suitable open-ended wrench.
- 1.4
Tighten lock nut -3-
.
> Tightening torque 90 Nm (67 ftlb.)
Tie-rod ball on tie rod
- Secure tie-rod ball -1-
to wheel bearing housing -2-
.
- 2.1 Position tie-rod ball -1- in wheel bearing housing -2- .
- 2.2
Fit and tighten nut -3-
.
> Tightening torque 85 Nm (63 ftlb.)
Tie-rod ball on wheel bearing housing