Installing Lock For Load-Through Provision
WARNING: This page is about a different variant/trim than selected.
- Installation is performed in reverse order. Pay particular attention to the following:
Screw in and tighten screws securing load-through provision lock to load-through provision > Tightening torque 20 Nm (15 ftlb.) +/- 2 Nm (1.5 ftlb.)
Screw in and tighten screw securing cover to load-through provision lock > Tightening torque 1.5 Nm (1 ftlb.)