Technical Values
WARNING: This page is about a different variant/trim than selected.
| Location | Description | Type | Basic value | Tolerance | Tolerance |
|---|---|---|---|---|---|
| Fastening screws securing highvoltage line to power electronics | -2- | Tightening torque | 8 Nm (6 ftlb.) | ||
|
High-voltage line from power electronics to high-voltage battery at power electronics |
|||||
| Fastening screw for ground line for power electronics, top | Item 3 | Tightening torque | 20 Nm (15 ftlb.) | ||
|
Ground line for power electronics, top |
|||||
| Fastening nut for positive cable for power electronics, bottom | Item 3 | Tightening torque | 20 Nm (15 ftlb.) | ||
|
Ground line for power electronics, bottom |
|||||
| Front axle carrier to body front | M12 x 1.5 x 90 thread/always replace bolts following removal. | Initial tightening | 70 Nm (51.6 ftlb.) | ||
| Front axle carrier to body front | M12 x 1.5 x 90 thread/always replace bolts following removal. | Final tightening | + 180° | ||
| Front axle carrier to rear body | Hexagonhead bolt, M10 x 45 | Tightening torque | 50 Nm (36.9 ftlb.) | ||
| Mounting anti-roll bar to body | M12 x 1.5 x 90 thread/always replace bolts following removal. | Initial tightening | 70 Nm (51.6 ftlb.) | ||
| Mounting anti-roll bar to body | M12 x 1.5 x 90 thread/always replace bolts following removal. | Final tightening | + 180° | ||
| Strut with mounting anti-roll bar to body | M12 x 1.5 x 90 thread/always replace bolts following removal. | Initial tightening | 70 Nm (51.6 ftlb.) | ||
| Strut with mounting anti-roll bar to body | M12 x 1.5 x 90 thread/always replace bolts following removal. | Final tightening | + 180° | ||
| Strut to body | Hexagonhead bolt, M10 x 25/always replace bolts following removal. | Initial tightening | 50 Nm (36.9 ftlb.) | ||
| Strut to body | Hexagonhead bolt, M10 x 25/always replace bolts following removal. | Final tightening | + 45° | ||
| Steering column centre to power-steering gear (universal joint) | Hexagon roundhead bolt, M8 x 30/always replace bolt following removal! | Initial tightening | 20 Nm (15 ftlb.) | ||
| Steering column centre to power-steering gear (universal joint) | Hexagon roundhead bolt, M8 x 30/always replace bolt following removal! | Final tightening torque angle | + 90° | ||
| Ground line to front PDCC (EAWS) control unit | Item 1: Internal hexagon roundhead bolt, M5 | Tightening torque | 5.6 Nm (4 ftlb.) | ||
|
Disconnecting ground lines |
|||||
| Fastening screws securing engine mount to bracket | M10 x 45 | Tightening torque | 55 Nm (41 ftlb.) | ||
| Fastening screw securing engine mount to front axle | M12 x 60 x 1.5 | Initial tightening | 70 Nm (52 ftlb.) | ||
| Fastening screw securing engine mount to front axle | M12 x 60 x 1.5 | Final tightening | + 90° | ||
| Screw-type clamp for pressure hose | Tightening torque | 5.5 Nm (4 ftlb.) | +/- 0.5 Nm (0.3 ftlb.) | ||