Installing Supply Line - V6 Turbo (Section From Engine To High-Pressure Pump)
WARNING: This page is about a different car, the 2020 Porsche Panamera, 2019 Porsche Panamera, 2018 Porsche Panamera, and 2017 Porsche Panamera. However, it is still accessible from the selected car via links, so may be relevant.
- Installation is performed in reverse order. Pay particular attention to the following:
Make sure that locks on connections engage securely.
Coat thread on union nut with Microgleit DF 977S. Observe drying time of at least 5 minutes before fitting!
Union nut > tightening torque of 10 Nm (7.4 ftlb.) .
Fastening screw on holder for camshaft controller actuator > Tightening torque 9 Nm (6.6 ftlb.) .
Fastening nuts for supply line > Tightening torque 9 Nm (6.6 ftlb.) .
Fastening screw for holder > tightening torque 8 Nm (5.9 ftlb.) .
Fastening screws for heat shield on high-pressure pump, M6 x 25 >.
Fastening screws for heat shield on high-pressure pump, M6 x 12 >.