LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2021 >> Macan Turbo >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 17 (15 Engine - Cylinder Head, Valve Drive 2.0L -- 95B - MACAN (95B)) >> WM, 156120 - Removing And Installing Valves (R4) >> Removing Valves >> Grinding Down Valves

Grinding Down Valves

WARNING: This page is about a different variant/trim than selected.

NOTIFICATION 

Valve grinding paste not removed 

Information 

Information 

New valves must always be ground down.

  1. Apply a small amount of valve grinding paste to the valve seat.
  2. Oil new valve  on the valve stem and push it into the valve guide from the combustion chamber until it is seated fully in the valve seat.
  3. Grind the valve with a commercially available valve grinder (with rubber suction head) using rotating movements. To do this, hold the valve grinder between the palms of both hands and press against the valve seat with rotating movements Valve seat. 
    G15144933Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Valve seat

  4. Perform grinding procedure for each new valve, then carefully remove valve grinding paste.
  5. Perform leak test.