LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2021 >> Macan Turbo >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 11 (13 Engine - Crank Drive, Pistons 2.0L -- 95B - MACAN (95B)) >> WM, 138555 - Replacing Balance Shafts (R4) >> Replacing Balance Shafts >> Installing Balance Shaft On Intake Side

Installing Balance Shaft On Intake Side

WARNING: This page is about a different variant/trim than selected.
  1. Before installing new balance shaft: Remove old sealing ring on balance shaft.

    > 138755 - REPLACING BALANCE SHAFT SEALING RING (R4) 

  2. Install new  balance shaft on intake side -1-  .
    G15144787Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Balance shafts

    1. 2.1  Oil the mount for the new balance shaft on the intake side with engine oil.
    2. 2.2  Insert balance shaft on intake side -1-  into cylinder block.
    3. 2.3  Replace screw for balance shaft on intake side -4-  .
    4. 2.4  Fit and tighten screw for balance shaft on intake side -4-  .

      > Initial - tightening torque 4 Nm (3 ftlb.) 

      > Final tightening torque + 45° 

  3. Replace O-ring -1-  for bearing pin of intermediate shaft gearwheel -2-  .
    G15144788Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Bearing pin for intermediate shaft gearwheel

    1. 3.1  Pull bearing pin for intermediate shaft gearwheel -2-  from cylinder block.
    2. 3.2  Replace O-ring -1-  .
    3. 3.3  Insert bearing pin for intermediate shaft gearwheel -2-  into cylinder block. Make sure that dowel pin -3-  of the bearing pin for intermediate shaft gearwheel -2-  engages in the bore on the cylinder block.

    Information 

    The intermediate shaft gearwheel must be replaced.

    The new intermediate shaft gearwheel has an anti-friction coating that wears off after a short time, thereby setting the correct tooth backlash automatically.

    If the intermediate shaft gearwheel is not replaced, there is a danger of engine damage due to incorrect tooth backlash.

  4. Install new  intermediate shaft gearwheel -1-  .
    G15144789Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Intermediate shaft gearwheel

    1. 4.1  Align balance shaft -3-  so that the markings on balance shaft -Arrow A-  and intermediate shaft gearwheel -Arrows B-  are aligned.
    2. 4.2  Copy marking -Arrows B-  on intermediate shaft gearwheel -1-  onto the teeth using a coloured marker to make it easier to fit intermediate shaft gearwheel -1-  .
    3. 4.3  Fit new intermediate shaft gearwheel -1-  .
    4. 4.4  Check that markings -Arrows-  are aligned correctly.
    5. 4.5  Replace screw on intermediate shaft gear wheel -2-  .
    6. 4.6  Fit and tighten screw on intermediate shaft gearwheel -2-  .

      > Initial - tightening 10 Nm (7.5 ftlb.) 

      Check intermediate gear for play by turning. If there is play on the intermediate gear: Loosen and tighten again.

      > Final - tightening 25 Nm (19 ftlb.) 

      > Torque angle + 90° 

    Information 

    The screw of the coolant pump drive belt pulley has a left-hand thread.

  5. Install coolant pump drive wheel -1-  .
    G15144790Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Coolant pump drive gear

    1. 5.1  Fit coolant pump drive wheel -1-  on the balance shaft -3-  .
    2. 5.2  Replace screw -2-  .
    3. 5.3  Screw in new screw -2-  as far as it will go by hand and then loosen by about three turns.
  6. Apply TDC marking on cylinder block . 
    G15144791Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    TDC marking

    1. 6.1  Check that markings -Arrows-  for TDC position of the crankshaft are aligned.
    2. 6.2  Apply marking on cylinder block -1-  using a permanent marker.
  7. Copy marking -1-  to the tooth of sprocket using a permanent marker.
    G15144792Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Marking on sprocket

  8. Fit balance shaft timing chain -1-  so that coloured chain links -Arrows-  are aligned with the markings on sprockets -2 and 3-  .
    G15144793Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Balance shaft timing chain

  9. Install sprocket
    G15144794Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Sprocket (three-stage)

    1. 9.1  Insert sprocket -1-  into balance shaft timing chain -2-  so that markings -A and B-  are aligned.
    2. 9.2  Fit sprocket -1-  on crankshaft -Arrow-  .
  10. Secure T10368 - thrust piece-1-  using crankshaft pulley screw -Arrow-  .
    G15144795Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Thrust piece on sprocket

  11. Install guide and tension rail -1 and 2-  for balance shaft timing chain.
    G15144796Courtesy of PORSCHE CARS NORTH AMERICA, INC.

    Balance shaft timing chain

    1. 11.1  Install guide rail -1-  .
      1. 11.1.1  Position guide rail -1-  .
      2. 11.1.2  Fit and tighten guide pins -5-  .

        > Tightening - torque 20 Nm (15 ftlb.) 

    2. 11.2  Install tension rail -2-  .
      1. 11.2.1  Position tension rail -2-  .
      2. 11.2.2  Fit and tighten guide pins -4-  .

        > Tightening - torque 20 Nm (15 ftlb.) 

    3. 11.3  Fit and tighten chain tensioner -3-  using screw-locking agent.

      > Tightening - torque 85 Nm (63 ftlb.)