LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2021 >> Macan Turbo >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 15 Engine - Cylinder Head, Valve Drive 2.9L -- 95B - MACAN (95B) >> WM, 154719 Removing And Installing Guide And TENSIONING Rails (V6 Turbo) >> Preliminary Work

Preliminary Work

  1. Remove the engine.
    • 100119 Removing and installing engine 
  2. Secure engine to assembly support.
    • 1001IN Securing engine on assembly support 
  3. Remove timing chain.
    • 153519 Removing and installing timing chain (V6 Turbo)