Working With Body Foam Filler: Hardening
The body foam filler used hardens at temperatures of between > Minimum temperature 15 °C and > Maximum temperature 28 °C .
The chemical reaction is essentially complete after approx. 30 minutes. The hardening time will be longer at low temperatures and shorter at high temperatures.
Do not put pressure on bonded parts until the required assembly strength is reached.