Joining Process
Information
- Use foam filler within the processing time.
- Do not apply pressure on foam-filled parts until hardening is complete.
- Remove seal on the activation lid.
- Use a piece of wire to pull the activation lid out as far as it will go (approx. 11 cm up to the notch).
- Break off the wire at the required rupture point (notch) over the valve.
- Screw plastic adapter into the valve.
- Shake can vigorously up and down (approx. 20 times).
- Release foam downwards out of the can with the valve.