Installing C-Pillar Reinforcement
Information
- Before final assembly, make sure you fully understand all the work steps involved and carry out a trial assembly without applying adhesive.
- The bonding process can only be carried out reliably when a smooth and swift sequence of operations is guaranteed.
- Do not begin bonding work until all materials and tools necessary for later repair work are available.
Information
Adhesive must not be applied to areas to be plug-welded or fully welded using inert gas.
- Install outer C-pillar and check that it fits perfectly. Check gap dimensions.
Adhesive
- 1.1 Apply foam filler to the body in area
Make sure that all openings and gaps between the body and C-pillar reinforcement are closed off with the sealing compound.
- 1.2
Apply adhesive on marked areas. > Application depth 3.0 mm
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
- Resistance spot-weld the C-pillar reinforcement.
C-pillar reinforcement
- 2.1 Plug-weld area -A - using inert gas.
- Resistance spot-weld the C-pillar reinforcement.
C-pillar reinforcement
- 3.1 Plug-weld area -Arrows- using inert gas.