B+ Line From Power Distributor To Transmission Connection Point
WARNING:
Vehicle can fall down
- Risk of squashing or crushing
- Risk of damage to the vehicle
→ Do not place any solid objects under the raised vehicle.
→ Ensure that the lifting platform is prevented from lowering.
→ Remove solid objects before lowering the vehicle.
→ Raise the vehicle only at the jacking points provided.
→ The outer jacking points should be used primarily.
NOTE:
Mechanical overload of components
- Component will be damaged irreparably
→ Observe guidelines for assembly and disassembly
Information
Check that the lines are routed correctly!
Information
- When lowering, the engine must not rest on the rear axle cross member.
Information
- It may only be supported over a large area at the oil pan.
- Localised loading is not permitted.
Information
Fastening nuts must always be replaced.
- Installation is performed in reverse order. Pay particular attention to the following:
- 1.1 Tighten fastening nut securing B+ line from power distributor to transmission connection point to > Tightening torque 15 Nm (11 ftlb.) .
- 1.2 Tighten fastening nut to > Tightening torque 12 Nm (8.8 ftlb.) until secure.
Check that the rubber sleeve is tight against the body over its entire length.