Preparing Connection Areas Of Body For Installing C-Pillar Reinforcement
- Align the sealing surfaces and connections of the body.
- De-burr connection areas and prepare for joining.
- Preparing marked area for bonding and riveting
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
Connection areas of body