Preparing Connection Areas Of The Body For Installing Hinge Pillar
- Align the sealing surfaces and connections of the body.
- De-burr connection points and prepare them for joining.
- Prepare marked areas for bonding, resistance spot-welding and full steel welding.
- 3.1
Prepare area -A-
for bonding and resistance welding.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
- 3.2
Prepare area -B-
for full steel welding.
Marked areas
- 3.1
Prepare area -A-
for bonding and resistance welding.
- Prepare marked area for applying a full steel weld.
Marked area