Preparing Connection Areas Of The Body For Installation
- Align the sealing surfaces and connections of the body.
- De-burr connection points.
- Prepare marked areas -A-
for bonding and riveting.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
Bonding areas
- Prepare marked areas -B-
for full steel welding.
Full steel welding