Installing Jacking Point
- APPLY ADHESIVE EVENLY ON THE JOINT AREA OF THE BODY. > APPLICATION DEPTH 0.5 MM
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
APPLYING ADHESIVE ON BODY
- APPLY ADHESIVE TO THE JACKING POINT.
- 2.1 APPLY ADHESIVE EVENLY OVER THE ENTIRE BONDING SURFACE. > APPLICATION DEPTH 0.5 MM
- 2.2
ALSO APPLY A BEAD OF ADHESIVE ALL AROUND THE BONDING SURFACE. > APPLICATION DEPTH 3 MM
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
APPLYING ADHESIVE ON JACKING POINT
- RIVET IN RIVETS FOR JACKING POINT -A-
. > BLIND RIVETS 999.190.227.01
> 5X00IN23 REPLACING PUNCH RIVETS AND PENETRATED JOINTS
BLIND RIVETS
- RIVET IN RIVETS FOR JACKING POINT -B-
. > BLIND RIVETS 999.190.230.01
> 5X00IN23 REPLACING PUNCH RIVETS AND PENETRATED JOINTS
BLIND RIVETS