Installing Floor Front Section
Information
- Before final assembly, make sure you fully understand all the work steps involved and carry out a trial assembly without applying adhesive.
- The bonding process can only be carried out reliably when a smooth and swift sequence of operations is guaranteed.
- Do not begin bonding work until all materials and tools necessary for later repair work are available.
- Install floor front section and check that it fits perfectly.
- Apply adhesive on the joint area of the body.
Apply adhesive evenly over the entire bonding surface. > Application depth 0.5 mm
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
Bonding area
- Apply adhesive on floor front section.
Apply adhesive evenly over the entire bonding surface. > Application depth 0.5 mm
Also apply a bead of adhesive all around the bonding surface. > Application depth 3 mm
Floor front section
- Rivet in floor front section.
Floor front section
A Set BLIND RIVETS > BLIND RIVETS 999.190.227.01 B Set BLIND RIVETS > BLIND RIVETS 999.190.227.01 Floor front section
A Set BLIND RIVETS > BLIND RIVETS 999.190.230.01 B Set BLIND RIVETS > BLIND RIVETS 999.190.227.01 - Rivet in floor front section. > BLIND RIVETS 999.190.227.01
Bore holes
- Rivet in floor front section. > BLIND RIVETS 999.190.229.01
Bore holes
- Weld ground connections
Ground connections