Preparing Connection Areas Of The Body For Installing (Inner) B-Pillar Reinforcement
- Align the sealing surfaces and connections of the body.
- De-burr connection points and prepare them for joining.
- Prepare connection areas of the body for joining.
Joint areas
- 3.1 Prepare marked areas -A-
for bonding and steel resistance spot-welding.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
- 3.2 Prepare marked areas -B- for full steel welding.
- 3.1 Prepare marked areas -A-
for bonding and steel resistance spot-welding.
- Prepare marked areas -A-
for bonding and riveting.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
Joint area