Preparing Connection Areas Of Body For Installing (Outer) B-Pillar Reinforcement
- Align contact surfaces and connections of the body.
- De-burr connection points and prepare them for joining.
- Prepare connection areas of the body for joining.
Joint areas
- 3.1 Prepare marked areas -LHD vehicle -
for bonding and riveting.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
- 3.2 Prepare marked areas -RHD vehicle -
for bonding and steel resistance spot-welding.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
- 3.3 Prepare marked area -Item C- for full steel welding.
- 3.1 Prepare marked areas -LHD vehicle -
for bonding and riveting.