Installing Outer Roof Pillar
Information
- Before final assembly, make sure you fully understand all the work steps involved and carry out a trial assembly without applying adhesive.
- The bonding process can only be carried out reliably when a smooth and swift sequence of operations is guaranteed.
- Do not begin bonding work until all materials and tools necessary for later repair work are available.
Information
- Apply adhesive evenly over the entire bonding surface.
- Tack on sheetmetal insert used as welding backing strip on the body.
Sheetmetal insert
- Install outer roof pillar, check that it fits perfectly and secure it.
- Weld flow-form welding rivets through bores on the body.
> 5X00IN29 REPLACING FRICTION ELEMENT WELDED JOINT
>RIVET 9A7.008.606.00
Friction element welded joint
- Remove outer roof pillar.
- Apply adhesive on the joint area of the body.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
>Application depth 3 mm
Bonding area on body
- Apply adhesive on outer roof pillar.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE PAH.071.781.00
>Application depth 0.5 mm
Outer roof pillar bonding area
- 6.1 Also apply a bead of adhesive all around the bonding surface.
>Application depth 3 mm
- 6.1 Also apply a bead of adhesive all around the bonding surface.
- Secure outer roof pillar.
Rivet area
- 7.1 Rivet in flow-form rivets -A-
.
> 5X00IN23 REPLACING PUNCH RIVETS AND PENETRATED JOINTS
>Flow-form rivet 97A.008.473.00
- 7.2 Press flow-form welding rivets -B- .
- 7.1 Rivet in flow-form rivets -A-
.
- Apply full aluminum weld to outer roof pillar.
Welding range
Welding range
Welding range
- Bend over edges in the door aperture using >VAS 6635 - Crimping pliers set, 4-piece
.
Bonding and seam areas