LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2020 >> Panamera Base >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 17 (15 Engine - Cylinder Head, Valve Drive 2.9L Turbo Gas -- 971 - PANAMERA (971)) >> WM, 153319 Removing And Installing Upper Chain Housing Cover (V6 Turbo) >> Technical Values

Technical Values

WARNING: This page is about a different variant/trim than selected.
Location Des... Type Basic val... Toleranc... Toleranc...
Double screw for additional coolant pump (castor) M6 x 14/M6 x 14 Tightening torque 9 Nm (6.6 ftlb.)    
Screws securing additional coolant pump (castor) to holder   Tightening torque 1.5 Nm (1.1 ftlb.)    
Screws for coolant pipe on left cylinder bank   Tightening torque 9 Nm (6.6 ftlb.)    
Screw for chain housing cover on cylinder bank 1 M6 x 22 (8 ea.)/replace, observe specified tightening sequence Tightening torque 9 Nm (6.5 ftlb.)    
Screw for chain housing cover on cylinder bank 2 M6 x 22 (7 ea.)/replace, observe specified tightening sequence Tightening torque 9 Nm (6.5 ftlb.)    
Fastening screw for high-pressure fuel line Replace tightening torque 8 Nm (5.9 ftlb.)    
Fastening screw for high-pressure fuel line   final tightening torque 45°    
Union nut for fuel line Coat thread on union nuts with Microgleit DF 977S. Observe drying time of at least 5 minutes before fitting. tightening torque of 10 Nm (7.4 ftlb.)    
Union nut for fuel line Coat thread on union nut with Microgleit DF 977S. Observe drying time of at least 5 minutes before fitting. Torque angle 60°