Installing Charge Air Cooler
WARNING: This page is about a different variant/trim than selected.
- Installation is performed in reverse order. Pay particular attention to the following:
- 1.1
Tighten screw on charge-air cooler.
- Tightening torque 7 Nm (5 ftlb.)
- 1.2
Tighten screw-type clamps on pressure hoses.
- Tightening torque 5.5 Nm (4 ftlb.)
- 1.1
Tighten screw on charge-air cooler.