LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2020 >> Macan Turbo >> Repair and Diagnosis >> Engine Mechanical >> Blowers, Superchargers & Turbochargers >> 21 Exhaust Gas Turbocharging 2.9L -- 95B - MACAN (95B) >> WM, 214119 - Removing And Installing Pressure Pipe (V6 BITURBO) >> Subsequent Work >> Subsequent Work (Pressure Pipe From Charge-Air Cooler To Charge-Air Cooler)

Subsequent Work (Pressure Pipe From Charge-Air Cooler To Charge-Air Cooler)

  1. Install air guide for charge-air cooler.
  2. Install cover for front lock support.