Installing Atf Cooling Line (Front Section)
WARNING: This page is about a different variant/trim than selected.
- Install front section of ATF cooling line -1-
.
ATF cooling line - front section
- 1.1 Fit front section of ATF cooling line
- 1.2
Screw in and tighten screws on the ATF cooling line -2 and 3-
.
> Tightening - torque 5 Nm (3.5 ftlb.)
- Connect ATF cooling line connection point.
Connection point for the ATF cooling line
- 2.1 Fit front sections -3- on rear section.
- 2.2
Screw on and tighten union nuts -1-
and counter at the hexagon -2-
at the same time.
> Tightening - torque 29 Nm (21 ftlb.)