Subsequent Work
WARNING: This page is about a different variant/trim than selected.
- Install sealing ring for double clutch.
- Fill in ATF.
Information
The PIWIS Tester instructions take precedence since the description may be different with later Tester releases.
The procedure described here has been structured in general terms. Different text or additional information may appear on the PIWIS Tester.
- Calibrate the double clutch using the PIWIS Tester
.
- 3.1 Connect the Tester to the vehicle and start it. Switch on ignition.
- 3.2 Select the required vehicle type.
- 3.3 Select PDK (Porsche Doppelkupplung (PDK)) control unit and press >> to continue.
- 3.4 Select the Maintenance/repairs menu and press >> to confirm your selection.
- 3.5 Calibrate must be selected. Then press F12 to continue.
- 3.6 Calibration after replacing transmission mechanism components/double clutch must be selected. Then press F8 to start.
- 3.7 The message "Calibration completed successfully" appears. Press F12 to end the process.
- 3.8 Switch off the ignition.
- 3.9 Wait 30 seconds.
- 3.10 Switch on the ignition.