LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2020 >> Macan Base >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 4 (15 Engine - Cylinder Head, Valve Drive 3.0L -- 95B - MACAN (95B)) >> WM, 154719 - Removing And Installing Guide And TENSIONING Rails (V6 Turbo) >> Technical Values

Technical Values

WARNING: This page is about a different variant/trim than selected.
Location Description Type Basic value Tolerance1 Tolerance2
Bearing pins for tensioning rail for left cylinder bank   Tightening torque 23 Nm (17 ftlb.)    
Screws on guide rail for left cylinder bank   Tightening torque 9 Nm (6.5 ftlb.)    
Bearing pins for guide rail for right cylinder bank Replace following removal. Initial tightening 5 Nm (3.5 ftlb.)    
Bearing pins for guide rail for right cylinder bank Replace following removal. Torque angle + 45°    
Bearing pins for tensioning rail for right cylinder bank   Tightening torque 23 Nm (17 ftlb.)