Preparing Side Panel For Installation
- Prepare connection areas for welding and bonding.
- Make cuts. > V.A.G 1561B - Electric cutter > VAS 6780 - Body saw
- Loosen the sheetmetal part as shown using a cut from the new part.
Preparing side panel for installation
WELDING SPECIFICATION
Magenta Resistance spot-welding + bonding Red Plug-welding (inert gas)/apply a full weld using inert gas without bonding Yellow Riveting + bonding Blue Bonding - Prepare connection areas for welding and bonding.
Preparing side panel for installation
Preparing side panel for installation
Preparing side panel for installation
- Close off cavities on the inside in the hood compartment area -arrows-
using seam seal.
Applying seam seal
- Prepare wheel housing at the connection areas for bonding and welding.
- 6.1 Drill holes in area -arrow- for plug welding using a drill bit with a diameter of > Diameter 8.0 mm Drill bit Ø.
Preparing wheel housing for installation
- Drill holes for plug welding in the marked areas -B -
using a drill bit with a diameter of > Diameter 8.0 mm
Drill bit Ø.
Drilling holes
WELDING SPECIFICATION
| Orange | Resistance spot-welding + bonding |
| Red | Plug-welding (inert gas)/apply a full weld using inert gas without bonding |