Installing Upper Front Roof Frame
Information
- Before final assembly, make sure you fully understand all the work steps involved and carry out a trial assembly without applying adhesive.
- The bonding process can only be carried out reliably when a smooth and swift sequence of operations is guaranteed.
- Do not begin bonding work until all materials and tools necessary for later repair work are available.
- Install upper front roof frame and check that it fits perfectly. Check gap dimensions.
> 5X00IN41 GAP DIMENSIONS - "Installing" section
- Apply adhesive. > Application depth 3.0 mm
Working with body structural adhesive
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE -"Installing" section.
Applying adhesive
- Resistance spot-weld area -A-
.
Installing roof frame lower part
- Resistance spot-weld the roof frame upper part.
- 4.1 MAG-weld area -arrows- .
Installing upper front roof frame