Preparing Connection Areas Of Body For Installing (Upper) Seat-Belt Connection Reinforcement
- Press out punch rivets in areas -A- . > VAS 6790 - Compact Booster
- Grind down punch rivets in areas -B-
.
Working on left punch rivets
Working on right punch rivets
- Drill out resulting punch rivet holes in areas -A-
. > Diameter 6.8 mm
Drilling out left punch rivet holes
Drilling out right punch rivet holes
- Fit in and secure (upper) seat-belt connection reinforcement at the left -1-
in accordance with dimension -x-
. > Length 7 mm
Courtesy of PORSCHE CARS NORTH AMERICA, INC.
Fitting in (upper) seat-belt connection reinforcement at the left
- Fit in and secure (upper) seat-belt connection reinforcement at the right -2-
in accordance with dimension -y-
. > Length 7 mm
Courtesy of PORSCHE CARS NORTH AMERICA, INC.
Fitting in (upper) seat-belt connection reinforcement at the right
- Mark drilling positions for body in areas -C-
and -D-
at existing bores on the (upper) seat-belt connection reinforcement at the left -1-
and (upper) seat-belt connection reinforcement at the right -2-
.
Marking drilling positions at the left
Marking drilling positions at the right
- Mark drilling positions for (upper) seat-belt connection reinforcement at the left and right in areas -A-
at existing bores on the body.
Marking drilling positions for (upper) seat-belt connection reinforcement at the left
Marking drilling positions for (upper) seat-belt connection reinforcement at the right
- Measure and mark drilling position on (upper) seat-belt connection reinforcement at the right -2-
in accordance with dimension -u-
and dimension -v-
.
Courtesy of PORSCHE CARS NORTH AMERICA, INC.
Measuring and marking drilling position
- Drill and de-burr hole at the previously applied marking in area -E-
through the (upper) seat-belt connection reinforcement at the right -2-
and the body. > Diameter 6.8 mm
Drilling hole on (upper) seat-belt connection reinforcement at the right
- Remove (upper) seat-belt connection reinforcement at the left and (upper) seat-belt connection reinforcement at the right from the body.
- Drill and de-burr holes at the previously applied markings in areas -C- . > Diameter 6.8 mm
- Drill and de-burr holes at the previously applied markings in areas -D-
. > Diameter 8.5 mm
Drilling holes on the body at the left
Drilling holes on the body at the right
- Prepare connection area on the body for bonding in the marked areas at the left and right.
> 5X00IN21 WORKING WITH BODY STRUCTURAL ADHESIVE
Preparing connection areas on body