LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> Macan Base >> Repair and Diagnosis >> General Information >> Electrical >> 2X Petrol, Exhaust, Engine-Electric - General 2.0L -- 95B - MACAN (95B) >> WM, 2X00IN Work Instructions After Disconnecting The Battery >> Disconnecting And Connecting Battery >> Test Drive After Disconnecting And Connecting The Battery

Test Drive After Disconnecting And Connecting The Battery

Information 

Depending on the vehicle equipment fitted, all these work steps are carried out during the test drive.

Read out the fault memories of all control units after the test drive.

  1. Perform a test drive.