LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> Macan Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 3 (15 Engine - Cylinder Head, Valve Drive 2.9L -- 95B - MACAN (95B)) >> WM, 158219 Removing And Installing Cylinder Head Cover (V6 Turbo) >> Subsequent Work >> Subsequent Work - Right Cylinder Bank

Subsequent Work - Right Cylinder Bank

WARNING: This page is about a different car, the 2024 Porsche Macan, 2023 Porsche Macan, 2022 Porsche Macan, 2021 Porsche Macan, and 2020 Porsche Macan. However, it is still accessible from the selected car via links, so may be relevant.
  1. Fit lower part of sound insulation.
  2. Install hydraulic valve for valve lift switchover.
    • 155519 Removing and installing hydraulic valve for valve lift switchover (V6 Turbo) 
  3. Install the high-pressure pump.
    • 246319 Removing and installing high-pressure pump (V6 Turbo) 
  4. Install fuel injectors.
    • 244019 Removing and installing fuel injector (V6 Turbo) 
  5. Install tank vent valve.
    • 202319 Removing and installing tank vent valve (V6 Turbo) 
  6. Install timing chain.
    • 153519 Removing and installing timing chain (V6 Turbo)