LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> Macan Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 3 (15 Engine - Cylinder Head, Valve Drive 2.9L -- 95B - MACAN (95B)) >> WM, 158219 Removing And Installing Cylinder Head Cover (V6 Turbo) >> Preliminary Work >> Preliminary Work - Right Cylinder Bank

Preliminary Work - Right Cylinder Bank

WARNING: This page is about a different car, the 2024 Porsche Macan, 2023 Porsche Macan, 2022 Porsche Macan, 2021 Porsche Macan, and 2020 Porsche Macan. However, it is still accessible from the selected car via links, so may be relevant.
  1. Remove timing chain.
    • 153519 Removing and installing timing chain (V6 Turbo) 
  2. Remove tank vent valve.
    • 202319 Removing and installing tank vent valve (V6 Turbo) 
  3. Remove fuel injectors.
    • 244019 Removing and installing fuel injector (V6 Turbo) 
  4. Remove the high-pressure pump.
    • 246319 Removing and installing high-pressure pump (V6 Turbo) 
  5. Remove hydraulic valve for valve lift switchover.
    • 155519 Removing and installing hydraulic valve for valve lift switchover (V6 Turbo) 
  6. Remove lower part of sound insulation.