LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> Macan Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 3 (15 Engine - Cylinder Head, Valve Drive 2.9L -- 95B - MACAN (95B)) >> WM, 158219 Removing And Installing Cylinder Head Cover (V6 Turbo) >> Preliminary Work >> Preliminary Work - Left Cylinder Bank

Preliminary Work - Left Cylinder Bank

WARNING: This page is about a different car, the 2024 Porsche Macan, 2023 Porsche Macan, 2022 Porsche Macan, 2021 Porsche Macan, and 2020 Porsche Macan. However, it is still accessible from the selected car via links, so may be relevant.
  1. Remove timing chain.
    • 153519 Removing and installing timing chain (V6 Turbo) 
  2. Remove fuel injectors.
    • 244019 Removing and installing fuel injector (V6 Turbo) 
  3. Remove hydraulic valve for valve lift switchover.
    • 155519 Removing and installing hydraulic valve for valve lift switchover (V6 Turbo) 
  4. Remove oil separator.
    • 105519 Removing and installing oil separator (V6 Turbo) 
  5. Remove brake booster vacuum pump.
    • 477619 Removing and installing brake booster vacuum pump (V6 Turbo) 
  6. Remove lower part of sound insulation.