LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> Macan Base >> Repair and Diagnosis >> External Pages >> Different car >> Section 3 (15 Engine - Cylinder Head, Valve Drive 2.9L -- 95B - MACAN (95B)) >> WM, 154719 Removing And Installing Guide And TENSIONING Rails (V6 Turbo) >> Technical Values

Technical Values

WARNING: This page is about a different car, the 2024 Porsche Macan, 2023 Porsche Macan, 2022 Porsche Macan, 2021 Porsche Macan, and 2020 Porsche Macan. However, it is still accessible from the selected car via links, so may be relevant.
Location Description Type Basic value Tolerance 1 Tolerance 2
Bearing pins for tensioning rail for left cylinder bank   Tightening torque 23 Nm (17 ftlb.)    
Screws on guide rail for left cylinder bank   Tightening torque 9 Nm (6.5 ftlb.)    
Bearing pins for guide rail for right cylinder bank Replace following removal. Initial tightening 5 Nm (3.5 ftlb.)    
Bearing pins for guide rail for right cylinder bank Replace following removal. Torque angle + 45°    
Bearing pins for tensioning rail for right cylinder bank   Tightening torque 23 Nm (17 ftlb.)