LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> Cayenne Turbo >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 19 Engine - Cooling 4.0L -- 9YA - Cayenne (9YA) >> WM, 196119 Removing And Installing Coolant Pipe (Engine) (V8 Turbo) >> Installing Coolant Pipe (Engine) >> Installing Coolant Pipe Switching Valve (Engine Control Unit For Transmission Oil Preheating)

Installing Coolant Pipe Switching Valve (Engine Control Unit For Transmission Oil Preheating)

  1. Installation is performed in reverse order. Pay particular attention to the following:
    1. 1.1  Replace gasket.
    2. 1.2  Screw in and tighten screws.

      > Tightening torque 9 Nm (6.5 ftlb.)