LEMON Manuals: Even more car manuals for everyone
Home >> Porsche >> 2019 >> Cayenne Turbo >> Repair and Diagnosis >> Engine Mechanical >> Exhaust >> 21 Exhaust Gas Turbocharging 4.0L -- 9YA - Cayenne (9YA) >> WM, 213019 Removing And Installing Turbocharger (V8 BITURBO) >> Preliminary Work >> Preliminary Work For Left Turbocharger

Preliminary Work For Left Turbocharger

  1. The right turbocharger (bank 1) must be removed in order to remove the left turbocharger (bank 2).
  2. Remove intermediate piece

    > WM, 505219 REMOVING AND INSTALLING INTERMEDIATE PIECE

  3. Vehicles without particle filter: 

    Remove primary catalytic converter at the right.

    > Removing and installing primary catalytic converter (V8 BiTurbo) 

  4. Vehicles with particle filter: 

    Remove particle filter (with catalytic converter) at the right.

    > 267419 REMOVING AND INSTALLING PARTICLE FILTER (WITH CATALYTIC CONVERTER)

  5. Vehicles without particle filter: 

    Loosen primary catalytic converter at the left from the turbocharger.

    > Removing and installing primary catalytic converter (V8 BiTurbo) 

  6. Vehicles with particle filter: 

    Loosen particle filter (with catalytic converter) at the left of the turbocharger.

    > 267419 REMOVING AND INSTALLING PARTICLE FILTER (WITH CATALYTIC CONVERTER)

  7. Disconnect oxygen sensor upstream of catalytic converter.

    > Removing and installing oxygen sensor upstream of catalytic converter (V8 BiTurbo) 

  8. Remove intake pipes.

    > Removing and installing intake pipe (V8 BiTurbo) 

  9. Disconnecting pressure pipe (on turbocharger) from pressure hose, left

    > 214119 REMOVING AND INSTALLING PRESSURE PIPE (V8 BITURBO)