Installing Supply Line - Section From High-Pressure Pump To High-Pressure Pump
WARNING: This page is about a different variant/trim than selected.
- Installation is performed in reverse order. Pay particular attention to the following:
- 1.1
Tighten supply line - section from engine to high-pressure pump - as follows:
- 1.1.1 Coat thread on union nuts with Microgleit DF 977S. Observe drying time of at least 5 minutes before fitting.
- 1.1.2 Fit union nuts by hand.
- 1.1.3
Fit and tighten screws on holder for supply line section.
> Tightening torque 9 Nm (6.5 ftlb.)
- 1.1.4
Tighten union nuts.
> Initial tightening 8 Nm (6 ftlb.) > Final tightening + 50°
- 1.2
Tighten screw on supply line holder.
> Tightening torque 9 Nm (6.5 ftlb.)
- 1.3
Tighten screws for coolant lines.
> Tightening torque 9 Nm (6.5 ftlb.)
- 1.1
Tighten supply line - section from engine to high-pressure pump - as follows: